How it works: The slurry (77.5 pcf) is heavier than water (62.4 pcf).
Phase 1: Injected 20′ down the slope via 3″ hose, the slurry flows as a thin 3″ invert column along the pipe bottom — traveling the full 650′ to the far end in ~14.8 min while water counter-flows above it back to the open entry end.
Phase 2: Slurry stacks from the far end back toward entry as water is continuously expelled. Washout (13.5%) occurs at the advancing slurry-water interface. Total gross to pump: 60.72 CY over ~3 hours.